Northeast construction and closings

Author: Jane Morrow

Portions of Stepan Drive and Holy Cross Drive will be temporarily closed to traffic to accommodate the construction of the east campus tunnel and utilities infrastructure. See the partial campus aerial maps below illustrating the expected traffic patterns. Traffic control detour signage will be placed along the various roads to help guide travelers.

PDFs for download:

Accessing Holy Cross Drive How to access Holy Cross drive during construction

Accessing the post office How to access the post office and police department during construction.

Logistics overview for May 19 – August 3 An overview of traffic and pedestrian flow during construction.